Case Studies · Construction & Contracting

The projects keep moving. The data falls behind.

Work runs smoothly. But every Saturday night, a week of data gets compiled all over again.

BysCore KontraktorBysHRCustom implementation
Project team in hard hats and safety vests walking through a warehouse construction site
The challenge

Nothing was recorded in an organized way while the work happened. Saturday crew payroll, supplier bills and billing the project owner always started by re-collecting numbers that already existed.

What we put in place

Estimates, schedule, field and money connected into one flow: attendance becomes weekly payroll, vendor payments attach to their work items, progress weights are calculated from the budget, and photos attach to numbered points on the floor plan.

What changed

Numbers are no longer rebuilt when someone asks, because they are collected as the work is reported. The impact in numbers has not been measured yet.

The problem

Many projects, high values, all running. But every question got the same answer: “hold on, let me check.”

This contractor wasn’t in trouble in the usual sense. Crews showed up, work progressed, payment terms were paid.

Only one thing was missing: a place where all of it was recorded as it happened. How much, how far along, paid or not. Every answer had to be dug up first.

What’s expensive isn’t the question, it’s the distance between the question and the answer.

Saturday nights that always ran late

Crews were paid weekly, every Saturday. The hard part wasn’t the calculation, it was the inputs, gathered only that day: who came in which day, how many overtime hours, how much in cash advances, who was paid daily and who was on a piecework contract.

The data existed, in foremen’s notes, field papers and people’s memory. But it was scattered. So every Saturday ended late at night, and the next week it started over.

Root cause

Every number rebuilt when asked

A supplier sends a bill: has this invoice been paid? The answer only existed after payment records were matched one by one.

In the other direction, billing the project owner required progress weights per work item, a report, and a map of the areas completed. All of it was assembled when the invoice was about to go out, not collected while the work happened.

So billing was delayed not because the work wasn’t done, but because the evidence hadn’t been assembled yet. What was held up wasn’t the work, it was the incoming cash.

Work finished, but impossible to show

There were too many project photos, not too few: hundreds piling up in phone galleries, with nobody knowing which angle or when they were taken.

The project owner asked for one thing: before and after, for one specific spot. Usually there weren’t two photos from a similar enough angle to compare.

What we did

BysCore Kontraktor · BysHR

There was one root cause. So instead of patching each complaint separately, we connected the parts that had always stood alone into a single flow.

  1. 01Estimates

    Budgets per division and per work item, each with its own unit price analysis: materials, labor, equipment. Two prices are tracked until the project ends: the selling price to the project owner and the internal cost.

  2. 02Schedule

    Each work item has a duration and dependencies. The S-curve builds itself: plan first, actuals follow.

  3. 03Field

    Supervisors take attendance with time-stamped photos and assign crews to the day’s work. Completed volumes are reported from a phone and move the S-curve in the office immediately, with no retyping.

  4. 04Money

    Every payment to vendors and crews attaches to its work item, so profit and loss doesn’t wait for the end of the project.

  5. 05Project owner

    A portal shows progress and photos without exposing internal costs.

Before & after

What changed.

Before: Saturday payroll: inputs hunted down that night
Now: A week of attendance flows into daily or piecework pay, then is locked in one action, cash advances and overtime included
Before: Supplier bills: matched again one by one
Now: Every purchase keeps its own payment status, with a summary of the total still unpaid
Before: Progress billing: weights, report and map assembled at the end
Now: Planned and actual weights calculated from the budget and field progress; the map is drawn directly on the floor plan
Before: Photos: hundreds in a gallery, no matching angles
Now: Numbered camera points on the floor plan, with shooting direction saved, so before and after can be compared

Payroll is still calculated, suppliers still send bills, project owners still get reports. What changed is when the numbers are collected: before, when they were needed; now, as soon as the work is reported. We deliberately don’t list time savings here. The impact hasn’t been measured, and we don’t publish numbers we haven’t measured.

Next case study · Distribution & WholesaleStrong sales. But where is the money today?

Does your business face the same thing?

Tell us how you work today. We'll show you which parts can be connected first.

Talk to us on WhatsApp